Site Investigation Project Activities


Site Preparation Activities

A comprehensive site investigation was completed in 2008.  Prior to beginning the investigation activities, the following preparation activities were performed:

  • Conducted a public meeting
  • Located utilities
  • Performed wildlife reconnaissance
  • Surveyed activity locations
  • Constructed an onsite temporary access road
  • Installed Oakton Street access gate and driveway
  • Installed, repaired and removed fencing and gates as necessary
  • Cleared site of some vegetation
  • Set up a field office

Site Investigation

The specific activities undertaken during the site investigation scope of work were:

  • Conducted geophysical survey in former drum storage area Geophysical Survey Map
  • Advanced four soil borings to an approximate depth of 45 feet to characterize the geology of the site GeoTech Boring Map
  • Advanced 80 soil probes to a minimum depth of 10 feet to characterize the environmental impacts across the site Grid Map
  • Advanced 36 soil probes to a minimum depth of 10 feet to characterize areas with previously identified impacts Target Area Probe Map
  • Excavated 44 test pits to various depths to confirm the presence, condition and location of sub-grade structures Test Pit Map
  • Advanced 97 soil borings to various depths within or adjacent to former structures to identify environmental impacts associated with former structures Structure Boring Map
  • Sampled four existing onsite groundwater monitoring wells
  • Conducted perimeter air monitoring
  • Submited soil and groundwater samples to a certified laboratory for analysis
  • Demobilized personnel and equipment from the site
  • Prepared a comprehensive site investigation report of findings
Comprehensive Site Investigation Map