Site Investigation Project Activities
Site Preparation Activities
A comprehensive site investigation was completed in 2008. Prior to beginning the investigation activities, the following preparation activities were performed:
- Conducted a public meeting
- Located utilities
- Performed wildlife reconnaissance
- Surveyed activity locations
- Constructed an onsite temporary access road
- Installed Oakton Street access gate and driveway
- Installed, repaired and removed fencing and gates as necessary
- Cleared site of some vegetation
- Set up a field office
Site Investigation
The specific activities undertaken during the site investigation scope of work were:
- Conducted geophysical survey in former drum storage area
Geophysical Survey Map
- Advanced four soil borings to an approximate depth of 45 feet to
characterize the geology of the site GeoTech Boring Map
- Advanced 80 soil probes to a minimum depth of 10 feet to characterize the
environmental impacts across the site
Grid Map
- Advanced 36 soil probes to a minimum depth of 10 feet to characterize areas with previously
identified impacts
Target Area Probe Map
- Excavated 44 test pits to various depths to confirm the presence, condition and location of sub-grade structures
Test Pit Map
- Advanced 97 soil borings to various depths within or adjacent to former structures to identify environmental impacts
associated with former structures
Structure Boring Map
- Sampled four existing onsite groundwater monitoring wells
- Conducted perimeter air monitoring
- Submited soil and groundwater samples to a certified laboratory for analysis
- Demobilized personnel and equipment from the site
- Prepared a comprehensive site investigation report of findings
Comprehensive Site Investigation Map